ARCHITECTURAL & ENGINEERING FEE SCHEDULE
DIVISION OF FACILITIES MANAGEMENT
ARCHITECTURAL & ENGINEERING FEE SCHEDULE
STATE OF DELAWARE
| CONSTRUCTION COST | SCHEDULE A | SCHEDULE B | SCHEDULE C |
| New | Renovation | New | Renovation | New | Renovation | |
| UP TO $500,000 | 9.0% | 13.0% | 8.0% | 11.0% | 7.5% | 9.5% |
| UP TO $2,500,000 | 8.5% | 11.5% | 7.5% | 10.0% | 7.0% | 9.0% |
| UP TO $5,000,000 | 7.5% | 10.5% | 7.0% | 9.5% | 6.5% | 8.0% |
| UP TO $10,000,000 | 7.0% | 9.5% | 6.5% | 8.5% | 6.0% | 7.5% |
| UP TO $15,000,000 | 6.5% | 8.5% | 6.0% | 7.5% | 5.5% | 6.5% |
| OVER $15,000,000 | TO BE NEGOTIATED |
SCHEDULE A (Complex Projects)
Health, Research, Correctional, Museum, and Special Facilities.
SCHEDULE B (Average Projects)
School, Office, Recreational, Armory, Public Safety, and Library Facilities.
SCHEDULE C (Simple Projects)
Garage, Warehouse, Industrial Facilities, Roofing Projects* (renovation does not apply).
The fees in this schedule pertain to the prime design professional for single lump sum projects. The prime design professional may be either a registered architect with respect to building design or a registered professional engineer with respect to engineering projects. These fees shall include all basic services as detailed in AIA Document B151-1997, including but not limited to:
- The necessary meetings, preliminary designs, and final designs.
- The production and coordination of complete architectural and engineering drawings and specifications, including computer aided design and drafting.
- Assistance during bidding.
- Construction administration, including meeting minutes.
The following services are not included in the above scheduled fees. They may be negotiated as additional services or be provided by the state.
- Land surveys.
- Geotechnical data.
- Planning and programming.
- Standards for construction.
- Building commissioning.
- Furniture planning and design.
- Extraordinary regulatory agency approvals.